Lift traffic analysis measures how a group of lifts performs across a theoretical five-minute period of peak traffic, on two axes: the quality of the service and its quantity. Six things move those numbers.
interactive report types
BIM Output & Live 3D Visualisation
in development
built for the people who design buildings
What is AdSimulo
Originally carried out by use of manual calculations and statistical tables, lift traffic analysis has, essentially, remained unchanged in its approach since the 1920s. The introduction of computerised traffic analysis in the mid 1970s, however, began a new era in the sophistication and speed of analysing lift traffic performance. It also enabled much more complex variations in floor populations, entrance/exit locations and control system types to be analysed quickly and accurately.
Lift traffic analysis for planning and comparative purposes is based upon the performance of a lift system (a given group of lifts, or just a single lift) during a theoretical 5-minute period of peak traffic.
The performance of the lift service in this 5-minute peak period has two distinct measures. These are its potential quality (related to waiting time) and quantity (related to number of passengers handled). These theoretical performance characteristics can then be compared to industry benchmarks such as CIBSE Guide D, or used to compare an existing lift system against a lift modernisation.
The two measures can be more clearly defined as follows.
SECONDS
Often measured by the time between consecutive lifts arriving at the main lobby, known as Average Interval (AI), or by the Average Waiting Time (AWT); journey time, how long passengers then spend inside the car, is tracked alongside both.
Divide the 5-minute (300 s) peak period by the Average Interval and you get the number of car departures in the peak 5-minute period.
PERCent
Measured by how many people can be moved in a given type of Traffic in 5 minutes. Known as the 5-minute handling capacity, it is usually expressed as a percentage of the population served by the given group of lifts.
Multiply the number of car departures within a 5-minute period by the number of passengers in the car, and you can calculate how many people have been moved. Handling capacity and average interval together are the two headline outputs of any lift traffic analysis.
Quality of service, measured. Average waiting time and journey time plotted in five-minute bands across a simulated up-peak, against a 30-second AWT target. The first band, 0 to 5 minutes, is the peak period this article describes.
These measures of performance are directly influenced by six things. Each one is a number you have to establish before an analysis can mean anything, and each one is dealt with in turn below.
One way, or two way
Conventional, or destination
Including the total travel distance of the
lifts
Expressed as an entrance bias on the lift
system
Of the building, or of the part of it
served by this group of lifts
Including their capacity, speed and
performance characteristics
This is the best estimate of the maximum number of people that might be present in the building, or the part of the building served by a given group of lifts. See the separate tutorial on Lift Performance Criteria for further guidance.
Population, floor by floor. Thirty floors at 30 people each: a working population of 900 over 120 m of travel. The same table carries the two other inputs this article covers: the total travel distance, and the entrance bias at the lobby.
As well as the actual number of lifts, their capacity (kg / number of persons), speed, and performance in terms of acceleration, jerk and door width / door operating times all impact the traffic performance of the lift or group of lifts being analysed.
Every one of these is an input. Capacity, speed, acceleration and jerk set how fast a car completes a round trip; door opening, closing and dwell times decide how much of the trip is spent standing still. The shaft car system also selects conventional single cars or twin cars sharing one shaft.
The peak 5-minute period of traffic can be during what is termed one way or two way traffic, meaning passengers are predominantly moving in one direction (into or out of the building), or, in the case of two way traffic, moving more or less in equal quantities in both directions.
For some buildings, we may wish to analyse peak traffic during just two-way peak periods; for others, we may wish to analyse both. In an office building, for example, that means the one-way morning peak period of up peak traffic as building users enter the building, and the two-way peak period during lunchtime as building users are both entering and leaving.
An up peak, running. 1,248 passengers arriving at the main lobby over the simulated period. Passengers are coloured by how long they have been waiting, so queue build-up in front of individual lifts is visible rather than inferred.
The table below defines the general approach to which traffic types are analysed in each type of building.
For most building types, including hotels, residential, car parks and retail developments, the lift control system generally adopted is what is termed conventional collective control, with two landing push buttons to register both "up" and "down" direction hall calls at intermediate floors.
For office buildings intending to employ three or more lifts in one group, the preference would normally be to adopt a destination hall call control system. This is where lift users book their destination floor using a keypad, touchscreen or secure card in the lobby, and are told which lift will take them to their
destination floor. There are no destination floor buttons inside the lift car. This latter control system can enable considerable improvements in system efficiency to be delivered, thereby reducing the number, speed and capacity of lifts that might otherwise be required with conventional control.
Any given lift or group of lifts will serve a fixed number of floors. In some instances not all lifts serve the same number of floors. The number of floors served, the inter-floor distance, and therefore the total travel distance of the lifts from the lowest to the highest floor served, all need to be accurately
included in the base data for the traffic analysis to be performed accurately.
1/20
A very rough rule of thumb: lift speed is usually optimal using a figure of one twentieth (0.05) of the total travel distance. For lifts travelling up to 100 m, a speed of up to 5.0 m/s might be appropriate. This rule, however, breaks down at both very short and very long travel distances.
Where users enter and exit the building, including whether there are particular user attractions within the building itself, such as a staff restaurant, is also a very important factor. This is indicated by placing an entrance bias on the lift system. Most usually it is 100% at the main lobby, but it may vary if there is
more than one entrance to the building, or for other reasons.
The lobby points at the bias. Shaft arrangement and lobby width, dimensioned. Where people arrive decides which floor the demand is loaded onto, and in an office up peak that is almost always this one.
For an architect, lift traffic analysis is a design input, not a check at the end. The number of lifts, their size and how they are grouped decide how much of every floor the core takes, and that is one of the hardest decisions to reverse once the structure is fixed.
Run it at concept stage and you can compare options while they are still cheap to change: four large cars against six smaller ones, one group against a low-rise and high-rise split. The same results become the evidence that the vertical transportation is fit for purpose when the client or the planning authority asks. For a first figure in minutes, use the free lift traffic calculator, or see how many elevators a building needs.
In an existing building the question changes from "what should we install?" to "why are people waiting?". Occupancy grows, tenants change and floors are repurposed, so the population the lifts were designed for may no longer be the one using them.
A traffic analysis of the building as it is now shows whether the problem is the number of lifts, their configuration, the control system or how demand is spread through the day. That gives a factual basis for a maintenance, control or lift modernisation decision, instead of reacting to complaints.
A sound study follows the same steps whoever runs it:
1. Define the population floor by floor, with the building use and the arrival pattern.
2. Choose the traffic conditions to model: up-peak, down-peak, lunch-time two-way and anything specific to the building.
3. Set the targets for the building type, normally from CIBSE Guide D or the local equivalent (see lift performance criteria).
4. Run the analysis, using simulation for complex or mixed-use buildings.
5. Compare the results with the targets and test alternatives where they fall short.
6. Document the chosen configuration and the reasons for it.
The deliverable is a report that states the inputs and shows the round trip time, interval, waiting time and handling capacity of each option. If you are reviewing one, how to read a lift traffic analysis report explains what to check first.
NEXT IN THIS TRACK
The benchmarks the numbers above get compared against, and how to estimate a working population.
Structured tutorials and worked case studies, from a first simulation to a signed-off lift design.
Everything above is the method. Running it across every lift configuration a building could take is what the software is for. AdSimulo is a lift traffic analysis and simulation application for architects, lift (elevator) designers and consultants, with an expert system, visualisation and BIM output. It enables the design of vertical transportation for most buildings within minutes.
The optimum solution usually implies the solution that meets the
agreed traffic design criteria yet takes the least amount of space
from the building, thereby maximising the remaining area available
to sell or rent. AdSimulo provides the optimum solution, and many
others, automatically and with the minimum of input data.
The Expert System searches thousands of lift combinations against your service goals, keeps only the ones that meet them, and ranks the complete buildings by floor area.
Set out below is a general comparison of features between AdSimulo and Elevate™, the lift simulation software sold by Peters research Ltd of the UK.
Automated reports providing comprehensive in-depth analysis of
simulation results, generic BIM output compatible with Revit, and
real-time visualisation video footage.
Automated reports providing comprehensive in-depth analysis of simulation results, generic BIM output compatible with Revit, and real-time visualisation video footage.
Solution visualisation. The same simulation played back in real time at the lobby or across the whole building, recordable as video footage for a client presentation.
BIM output. The selected solution becomes a generic model against ISO 8100-30, with the shaft footprint stated in square metres, ready to place in the building BIM and to price competitively across suppliers.
AdSimulo is a web application based on client-server architecture. Users log
into the system and manage simulation projects through a web browser.
Connection is encrypted using industry standard SSL technology (Secure
Socket Layer) and all data is sent over the https protocol. All project data is
stored in dedicated database servers, secured with state-of-the-art firewalls
and backed up on a daily basis. Behind that sit three separate clusters.
The fastest simulations in the lift industry.
An elastic, scalable on-demand cloud
architecture that guarantees availability of
processing power regardless of the size of
your project. Multi-core, multi-processor
servers with high performance Xeon
processors run every iteration of the same
simulation simultaneously. That matters
most for the Expert System, where hundreds
of sub-simulations often have to run before
the best solution is found.
Reports close to instantaneously. Kept
separate from the simulation servers to
ensure smooth operation, so reports
containing in-depth analysis of simulation
results are generated close to
instantaneously. Complete reports
containing thorough analysis can be
downloaded in .doc format.
Rendered and streamed live. A further
cluster equipped with high performance
GPUs renders and streams 3D visualisation
of the movement of passengers and lifts in
the building in real time.
AdSimulo is well prepared for international use. Apart from English it is
currently available in five language versions, with more to be added soon.
Any modern web browser that supports HTML5: Microsoft Edge, Google Chrome, Mozilla Firefox or Safari.
At least 512 kbps is recommended to watch the online video footage. For all other system functions, most standard connection speeds will be sufficient.
None. AdSimulo runs in the browser; simulations,
reporting and rendering all happen on our servers.
Contact us
Questions about lift traffic analysis, pricing or a specific building? Send us a message and we'll reply within one working day.