V6.10 BETA How we calculate your results

AdSimulo V6.10 Beta is now available. Explore the new features and share your feedback.

V6 Changelog

log in to try it

AdSimulo University

Adsimulo V6 User Guide

Everything you need to use Adsimulo V6, step by step: creating projects, the Expert System, sky lobby buildings, twin lifts, all 23 reports, the Report Builder, 3D visualisation and BIM output. Read it online or download the 70-page PDF.

icon-start-video

What's New in Adsimulo 6.9

A four-minute tour of the new tools in Adsimulo 6.9: compare up to four simulations, batch sizing, evacuation and calibration studies, share links, calculators, BIM model and drawings.

icon-bim

Basics of Lift Traffic Analysis

Originally carried out by use of manual calculations and statistical tables lift traffic analysis has, essentially, remained unchanged in its approach since the 1920’s.

icon-speed

Lift Performance Criteria

Different types of buildings require a different approach to assessing what might be termed their working populations.

icon-start-video

Getting Started – Case Study Office HQ

A new office building is to be constructed as the headquarters for the Service Co. in Birmingham, West Midlands, United Kingdom. A brief has been given as follows.

icon-expert-video

Expert System – Case Study Residential Tower

A new luxury residential tower is to be constructed in the 14th district in Paris for the Grand Land Co. called “The Point”. A brief has been given as follows.

icon-case-studies-video

Expert System – Case Study Hotel

A new boutique city centre hotel is to be constructed for the Boutique Hotel Co. in Kowloon, Hong Kong.

icon-case-studies-video

Simulation System – Traffic Analysis for Modernisation Projects

The general experience of most office buildings during the past 25 years or so has been a slow but ever increasing density of occupation.

Lift traffic guides by topic

Every AdSimulo guide in one place, grouped by the question you are trying to answer.

Contact us

Talk to the team

Questions about lift traffic analysis, pricing or a specific building? Send us a message and we'll reply within one working day.

We typically respond within 1 working day